Raycaster/ Eval

APEX-Agents

gpt-5.4-mini on World434_AH_03

2/2Pass
Domain
Law
Category
AI Agents for Real Estate Lease Review
Harness
dual

Grader rubric

Criteria verdict

  1. States the auditor's recommendation is incorrect

  2. States a fire-rated enclosure for the basement exit staircase is not required

Prompt excerpt

Task context

One of the Singapore properties we're acquiring (classified PG III) has an exit staircase that services the 1 level underground parking lot, located immediately under the exit staircase that services the above ground floors. The staircases are not continuous and are separated. The audit confirmed that exit distances in the basement to ground level doors comply with the "Determination of Exit Requirement" table. However, the auditor flagged that while the separation between the basement exit staircase and the above-ground exit staircase was fire-rated, the basement exit staircase did not have a fire-rated enclosure and that this was a deficiency that would need to be rectified. The cost will be huge, as the entire building will need to be shut down and major construction completed. Is the auditor's recommendation strictly necessary under Singapore's rules, or can we avoid this cost? Give your assessment to me here as a reply.

Response trace

Agent response, tools, files, and edits

Open full trace

On a phone, the interactive viewer works best full-screen — pick the narrative report or the files & trajectory workspace.

Why Eval exists · why Workspace exists

Public evidence and cloud agents are the same harness.

Eval exists so scores are inspectable—tasks, trajectories, artifacts, and rubric verdicts anyone can open.Workspace exists so people can automate real file work with that harness, and so Raycaster never evaluates work it cannot perform.