APEX-Agents · Management Consulting
World131_IB_05
APEX-Agents task World131_IB_05 in AI Agents for Infrastructure Finance. Compare dual-harness agent runs across models — rubric criteria, scores, and public traces.
Task prompt
What the agent was asked to do
Find out the ratio between Curtailment_GWh and Redispatch_GWh and for the lowest average ratio of Country-Region pair, report the average Avoided Curtailment (MWh) and causes of curtailment. Represent the average Avoided Curtailment to two decimal places Present these findings on a new slide you create.
Published trajectories
Agent runs on this task
Curated dual-harness runs (parsed + original sandbox). Best scored run per model.
| Model | Harness | Score | Result | Links |
|---|---|---|---|---|
| GPT-5.5showcase | dual | 5/6 | Fail | Share pagePublic trace |
| Gemini 3.1 Pro | dual | 5/6 | Fail | Share pagePublic trace |
| GPT-5.4 | dual | 5/6 | Fail | Share pagePublic trace |
| GPT-5.4 mini | dual | 5/6 | Fail | Share pagePublic trace |
| GPT-5.4 nano | dual | 5/6 | Fail | Share pagePublic trace |
Grading rubric
Criteria and grader verdict (showcase run)
States the Country-Region combination with the lowest ratio is Germany-North
PassEvidence: Slide 10 in `/root/workspace/filesystem/8) Final deliverables/EuroGrid transmission network modernization.pptx` states “Germany – North” under “Lowest Country–Region pair”; TEXT_RESPONSE also says “Lowest average ratio: Germany – North at 1.84x.” Assessment: Criterion “States the Country-Region combination with the lowest ratio is Germany-North” is met.
States the Average Avoided Curtailment for Germany-North combination is 243,275.56 MWh
FailEvidence: Slide 10 shows “Average avoided curtailment (MWh)” as “228,025.94”; TEXT_RESPONSE likewise says “Average Avoided Curtailment: 228,025.94 MWh.” Assessment: Criterion requires “243,275.56 MWh” for Germany-North, but the delivered slide/response states a different value, so it is not met.
States one of the causes of curtailment for Germany is Thermal Overload
PassEvidence: Slide 10 “Curtailment causes (Germany)” lists “Thermal Overload 42.4%”; TEXT_RESPONSE includes “Thermal Overload.” Assessment: Criterion “States one of the causes of curtailment for Germany is Thermal Overload” is met.
States one of the causes of curtailment for Germany is Voltage Violations
PassEvidence: Slide 10 “Curtailment causes (Germany)” lists “Voltage Violations 42.4%”; TEXT_RESPONSE includes “Voltage Violations.” Assessment: Criterion “States one of the causes of curtailment for Germany is Voltage Violations” is met.
States one of the causes of curtailment for Germany is Congestion
PassEvidence: Slide 10 “Curtailment causes (Germany)” lists “Congestion 44.7%”; TEXT_RESPONSE includes “Congestion.” Assessment: Criterion “States one of the causes of curtailment for Germany is Congestion” is met.
States one of the reasons of Curtailment for Germany is Redispatch Conflicts
PassEvidence: Slide 10 “Curtailment causes (Germany)” lists “Redispatch Conflicts 46.5%”; TEXT_RESPONSE includes “Redispatch Conflicts.” Assessment: Criterion “States one of the reasons of Curtailment for Germany is Redispatch Conflicts” is met.