Raycaster / evalsBack to AI Agents for Infrastructure Finance

APEX-Agents · Management Consulting

World131_IB_05

5/6Fail

APEX-Agents task World131_IB_05 in AI Agents for Infrastructure Finance. Compare dual-harness agent runs across models — rubric criteria, scores, and public traces.

AI Agents for Infrastructure FinanceManagement Consulting World 131Dual harnessGrader: rubric
task_699ea5ca3b0243a5852ad33e33043f12
Management Consulting World 131
make_new_slide_deck
5 models · dual config

Task prompt

What the agent was asked to do

Find out the ratio between Curtailment_GWh and Redispatch_GWh and for the lowest average ratio of Country-Region pair, report the average Avoided Curtailment (MWh) and causes of curtailment. Represent the average Avoided Curtailment to two decimal places Present these findings on a new slide you create.

Published trajectories

Agent runs on this task

Curated dual-harness runs (parsed + original sandbox). Best scored run per model.

ModelHarnessScoreResultLinks
GPT-5.5showcasedual5/6Fail
Gemini 3.1 Produal5/6Fail
GPT-5.4dual5/6Fail
GPT-5.4 minidual5/6Fail
GPT-5.4 nanodual5/6Fail

Grading rubric

Criteria and grader verdict (showcase run)

  1. States the Country-Region combination with the lowest ratio is Germany-North

    Pass

    Evidence: Slide 10 in `/root/workspace/filesystem/8) Final deliverables/EuroGrid transmission network modernization.pptx` states “Germany – North” under “Lowest Country–Region pair”; TEXT_RESPONSE also says “Lowest average ratio: Germany – North at 1.84x.” Assessment: Criterion “States the Country-Region combination with the lowest ratio is Germany-North” is met.

  2. States the Average Avoided Curtailment for Germany-North combination is 243,275.56 MWh

    Fail

    Evidence: Slide 10 shows “Average avoided curtailment (MWh)” as “228,025.94”; TEXT_RESPONSE likewise says “Average Avoided Curtailment: 228,025.94 MWh.” Assessment: Criterion requires “243,275.56 MWh” for Germany-North, but the delivered slide/response states a different value, so it is not met.

  3. States one of the causes of curtailment for Germany is Thermal Overload

    Pass

    Evidence: Slide 10 “Curtailment causes (Germany)” lists “Thermal Overload 42.4%”; TEXT_RESPONSE includes “Thermal Overload.” Assessment: Criterion “States one of the causes of curtailment for Germany is Thermal Overload” is met.

  4. States one of the causes of curtailment for Germany is Voltage Violations

    Pass

    Evidence: Slide 10 “Curtailment causes (Germany)” lists “Voltage Violations 42.4%”; TEXT_RESPONSE includes “Voltage Violations.” Assessment: Criterion “States one of the causes of curtailment for Germany is Voltage Violations” is met.

  5. States one of the causes of curtailment for Germany is Congestion

    Pass

    Evidence: Slide 10 “Curtailment causes (Germany)” lists “Congestion 44.7%”; TEXT_RESPONSE includes “Congestion.” Assessment: Criterion “States one of the causes of curtailment for Germany is Congestion” is met.

  6. States one of the reasons of Curtailment for Germany is Redispatch Conflicts

    Pass

    Evidence: Slide 10 “Curtailment causes (Germany)” lists “Redispatch Conflicts 46.5%”; TEXT_RESPONSE includes “Redispatch Conflicts.” Assessment: Criterion “States one of the reasons of Curtailment for Germany is Redispatch Conflicts” is met.