Raycaster / evalsBack to AI Agents for Digital Transformation

APEX-Agents · Management Consulting

World130_Al-Zhoheir_Hajim_04

0/5Fail

APEX-Agents task World130_Al-Zhoheir_Hajim_04 in AI Agents for Digital Transformation. Compare dual-harness agent runs across models — rubric criteria, scores, and public traces.

AI Agents for Digital TransformationManagement Consulting World 130Dual harnessGrader: rubric
task_632105b2a93445ac8c4e16d6b17b836a
Management Consulting World 130
message_in_console
5 models · dual config

Task prompt

What the agent was asked to do

Calculate the Adjusted Cost of Instability for each site, defined as Abnormal scrap cost/(Actual Scrap %−Normal Scrap %) = adjusted cost of instability. The target scrap rate of HarFeast is the minimum in the range of acceptable scrap rate in the scrap rate report. Just use COGS per ton as your scrap cost for now. Report your final answers to me in a message. Round values to the nearest dollar.

Published trajectories

Agent runs on this task

Curated dual-harness runs (parsed + original sandbox). Best scored run per model.

ModelHarnessScoreResultLinks
GPT-5.5showcasedual0/5Fail
Gemini 3.1 Produal0/5Fail
GPT-5.4dual0/5Fail
GPT-5.4 minidual0/5Fail
GPT-5.4 nanodual0/5Fail

Grading rubric

Criteria and grader verdict (showcase run)

  1. States that the adjusted cost of instability for Rockford, Illinois plant is $246,873,668

    Fail

    Evidence: <TEXT_RESPONSE> table states “Rockford, Illinois Plant | $252,248,221.” Assessment: Criterion requires stating Rockford is $246,873,668; the response gives a different value, so fail.

  2. States that the adjusted cost of instability for Madison, Wisconsin plant is $199,836,340

    Fail

    Evidence: <TEXT_RESPONSE> table states “Madison, Wisconsin Plant | $205,106,414.” Assessment: Criterion requires stating Madison is $199,836,340; the response gives a different value, so fail.

  3. States that the adjusted cost of instability for Cedar Rapids, Iowa plant is $243,560,709

    Fail

    Evidence: <TEXT_RESPONSE> table states “Cedar Rapids, Iowa Plant | $248,605,950.” Assessment: Criterion requires stating Cedar Rapids is $243,560,709; the response gives a different value, so fail.

  4. States that the adjusted cost of instability for Toledo, Ohio plant is $230,836,061

    Fail

    Evidence: <TEXT_RESPONSE> table states “Toledo, Ohio Plant | $237,106,441.” Assessment: Criterion requires stating Toledo is $230,836,061; the response gives a different value, so fail.

  5. States that the adjusted cost of instability for Kalamazoo, Michigan plant is $232,003,983

    Fail

    Evidence: <TEXT_RESPONSE> table states “Kalamazoo, Michigan Plant | $236,361,510.” Assessment: Criterion requires stating Kalamazoo is $232,003,983; the response gives a different value, so fail.